Bathroom 2
December 2nd, 2007Is it going to be a continuing story? Until now it is.
It ought to be a one week job. But after two weeks now the only result is that my bathtub is turned in the opposite direction, something I wanted. And that the screen that protected the bathroom of the shower, watering the whole room, is gone. So showering must be done very carefuly.
And there are already water pipes for the new shower.
It’s partly my own fault I suppose. The shower barge is to smal for this great shower I ordered. So it had to be changed. Luckily they can manage that but is takes time. And because the new bathtub is not ready before januari all the rest can be done at the same time. With some patience it will be exactly as I want it to be.